Berthing Facilities

berthing-300

SASAPE INTERNATIONAL SHIPYARD LIMITED can provide metres of wharf space with 12 metres depth at zero tide. The facility is built on a natural deep water harbour.

Bunkering: Fuel can be bunkered from bulk tanks at our Silentworld Wharf 300 metres away

Fendering:The wharves have timber fenders, however it is advised that vessels supply their own fendering

Work area wharves:There are five wharves designated for work areas including crane access and workshops

Waste oil and Water removal:This can be arranged for removal whilst berthed

Rubbish removal: Skip bins can be provided for hard waste

Fresh water: Freshwater is available for connection and rain water tanks are available for drinking water

Shore Power: Shore power is available on request:415 Volt 3 phase and 240 Volt Single phase

Storage: Storage is available in one of our secure sheds

steel-plate-transfer-300engine-installation-300